August 20, 2026
"They artificially set it at 2,000 units in the town center. The acreage could support much more than that." That's David Pyle, Sammamish's Community Development Director, describing how the city arrived at the housing cap that governed its Town Center for nearly two decades. The number was reverse engineered to hit a target, not derived from what the land could actually hold. Then, in July 2025, the city council decided to stop pretending otherwise, and voted to let that number grow. Four months later, an election reversed the political mood entirely. The rezone is now paused. The townhomes it was supposed to enable are already for sale.
If you're comparing Sammamish to Redmond or Bellevue on a portal right now, you're looking at a single median price for a city that is currently running two different experiments at once, on the same 240 acres, on two completely different clocks. One clock is political and has stopped. The other is contractual and hasn't.
The timeline matters more than the number itself, because the number is still moving:
As of this writing, no new vote has been scheduled. The 4,000-unit ceiling exists on paper. Whether it survives contact with the new council is genuinely unresolved.
Here's the detail that makes this more than local politics: since the original 2008 Town Center plan was adopted, only 326 housing units were actually built inside it, while the rest of Sammamish added more than 3,500 homes, almost entirely detached single-family lots. The Town Center was designed to be Sammamish's downtown. For seventeen years, it mostly wasn't.
While the council debates the next 4,000 units, the first phase of construction that predates the political fight is already delivering.
Parkside Sammamish, built by Terrene Homes at the corner of 222nd Place SE and SE 4th Street, is on the market now. The development offers 38 townhomes across four floor plans, starting at $1,499,900 for a 2,148-square-foot, four-bedroom layout and topping out near $2,199,900 for a 3,002-square-foot, five-bedroom plan. Three of the homes are set aside as ARCH-subsidized units for income-qualified buyers, a requirement tied to the project's affordable housing obligations.
TerraLuxe, built by Taylor Morrison, is the second phase in the same corridor, roughly 45 more townhomes scheduled to reach the market in fall 2026.
Neither of these projects required the 4,000-unit vote to happen. They were entitled under the earlier 2,000-unit framework. What comes after them, the seven-story mixed-use buildings planned for the core blocks near Metropolitan Market, is the part still waiting on political direction. The Sammamish Independent reported that phase includes a roughly 344-unit apartment and mixed-use building still in permit review, alongside a separate proposal for a 95-to-100-unit Aegis Living senior facility that developers had targeted for a first-quarter 2026 groundbreaking, contingent on construction costs and financing conditions. A regional stormwater vault, funded at roughly $5.2 million by the developer, was on track for a spring 2026 completion, part of the infrastructure the whole district depends on before it can absorb more density.
Innovation Realty Partners, the developer behind the core mixed-use blocks, has been explicit that the timeline is long no matter what the council decides next. Its CEO told the Sammamish Independent that the idea thousands of units would appear overnight is simply false. Building permits alone can take over a year once construction plans are drawn.
The citywide numbers describe an average of these two markets, not either one specifically. Sammamish's median sale price sat at roughly $1.6 million over the three months ending in May 2026, down 4.9 percent year over year, with homes averaging about six days on market, according to Redfin. That headline describes the plateau's traditional resale market more than it describes what's happening four blocks from the grocery store.
One separate data provider's June 2026 report put months of supply at 3.8, up 82.7 percent from the year before, a sign that inventory citywide is loosening even as the competitive headline number gets repeated. Zillow's home value index, meanwhile, showed a steeper 12.7 percent year-over-year decline as of mid-2026, a larger drop than Redfin's figure for the same period. When two respected sources disagree by more than double on how much values moved, the disagreement itself is worth sitting with: something is shifting the composition of what's selling, not just repricing the same houses downward.
| Town Center new construction (Parkside, TerraLuxe) | Plateau resale (Klahanie, Trossachs, Beaver Lake) | |
|---|---|---|
| Entry price | From roughly $1.5M | Widely variable, commonly $1.5M-$2M+ |
| Land | Attached townhome, no yard maintenance | Typically quarter-acre or larger lots |
| What's fixed | Floor plan, delivery date, builder warranty | Nothing new to build, home exists today |
| What's uncertain | Surrounding retail, apartment build-out, adjacent construction timeline | City's long-term Town Center vision, which could affect nearby amenities and traffic patterns over years |
| School access | Depends on specific parcel and district lines | Established boundaries within Issaquah or Lake Washington School District |
Neither column is the better bet in the abstract. They solve different problems for different buyers.
If you're touring Parkside or TerraLuxe, the disclosure package looks nothing like a resale on a quarter-acre lot in Trossachs. A phased master-planned community carries a different set of questions, and they're worth asking before you write an offer, not after.
Read the homeowners association budget and reserve study directly rather than taking a builder's summary at face value. Ask how the CC&Rs handle noise, dust, and access disruption from construction on adjacent blocks, since the core mixed-use phase and the Aegis Living facility are both still working through permitting on parcels near these townhomes. Ask specifically what happens to shared walls and party-wall maintenance obligations once the association transitions from builder control to homeowner control, a milestone that typically shifts financial responsibility onto owners.
None of this is a reason to avoid new construction inside Town Center. It's a reason to treat the diligence period differently than you would for a home that has already weathered fifteen years of ownership without incident.
A buyer trading up from a townhome in Redmond or Kirkland who wants walkable access to Metropolitan Market and Sammamish Commons, without the maintenance load of a large lot, has a narrow and specific window right now. Parkside is selling. TerraLuxe arrives this fall. Whatever comes after that, the apartments, the senior living facility, the retail buildout, depends on a council that has already shown it will pause rather than rush.
A homeowner sitting on an appreciated plateau property who wants to right-size without leaving the city faces the mirror image of that decision. The traditional plateau market, per Redfin's three-month window ending in May 2026, is still moving in about six days on average. That's not a market where a seller needs to wait for Town Center's politics to resolve before listing.
If you're weighing new construction against a plateau resale, or trying to figure out how a stalled rezone might reshape the neighborhood you're about to commit to, that's exactly the kind of question worth working through with someone who tracks this market daily rather than piecing it together from a single portal listing.
Is the Sammamish Town Center rezone dead? No. It's paused, not canceled. The city halted its consultant's work on the zoning code overhaul in late November 2025 pending direction from the newly seated council, but the underlying 4,000-unit alternative that the prior council adopted in July 2025 has not been formally repealed.
Does the pause affect homes already under construction, like Parkside? No. Parkside and TerraLuxe were entitled under the earlier framework and are proceeding on their own construction timelines regardless of what happens with the broader rezone.
How does the Town Center uncertainty affect resale value on the plateau? It's too early to say with precision, since the core apartment and retail phases that would most reshape the area's character and traffic are still in permit review. What's measurable today is that plateau resale homes are moving quickly, in about six days on average over the three months ending in May 2026, independent of how the Town Center debate resolves.
If you're trying to figure out where you fit in Sammamish's next chapter, whether that's a new-construction townhome near the Town Center or a resale further out on the plateau, Deepti Gupta Real Estate can walk you through both markets side by side. Schedule a consultation and we'll help you read the data that actually applies to your decision, not just the headline that shows up on a portal search.
Stay up to date on the latest real estate trends.
Our team provides professional services in buying, selling, and investing areas, ensuring the best results for our valued clients. So, what are you waiting for? Reach out to us, and we will help you find a house that’ll make you feel at home!